HOEVE VAN DEUREN
Arthur Dezangrélaan
12
,
1950
Kraainem
Demolition of the old, existing buildings and the new construction of the CPAS service center on the ground floor (= a multipurpose room with adjustable walls for meals (Resto & Co, Lunch & Co...), various activities and courses; a computer corner accessible to the public; the Child's House; a care room; a kitchen; a bar with access to the terrace; two offices for administrative staff; showers and sanitary facilities) and 8 apartments on the 1st & 2nd floor (= 4 large ones with 3 bedrooms and four smaller ones with 1 bedroom. They are primarily intended as emergency homes and for refugees (LOI: Local Shelter Initiative)).
The building will be built on 50 cm poles to protect against possible floods. There is a gabled roof with solar panels. A heat pump provides heating. De Hoeve will be equipped with an electric lift + access for the disabled. A burglar alarm will also be installed.